CITY OF LOGAN LIGHT & POWER
RATE SCHEDULE #10
ALTERNATE ENERGY NET METERING
Availability:
At any point on the City’s interconnected system where there are facilities of adequate capacity.
Application:
This schedule is for electric service applications for customers that have alternate renewable electric power generation on the customer side of the meter. This schedule is intended for customers that generate electric energy from renewable sources that they would otherwise purchase from the City utility.
A customers generating facility used for net metering shall be equipped with metering equipment that can measure the flow of electricity in both directions. The city will install a meter capable of measuring bi-directional energy flow at the customer’s expense. The normal cost of a meter will be deducted from the cost of the bi-directional meter.
This will normally be accomplished through use of a single bidirectional meter. At the customer’s request and expense an additional meter may be installed for the customer’s purposes. Other requirements are outlined in the Logan City Light and Power Net Metering Policy.
The customer shall adhere to all service and billing requirements including the installation of approved metering equipment as per Logan City Electric Service Requirements.
Energy Rate for Energy Purchased by the Customer:
The City shall credit the Customer in kilowatt-hours (kWH) at a ratio of 1:1 for any excess production of their generating facility that exceeds the customer’s on-site consumption of kWh in the billing period each month. Excess energy generated by the customer which would otherwise be purchased from the utility will offset energy at the full retail rates up to the amount of energy the customer uses each month. Excess energy generated beyond the customers use during daytime hours will be purchased by the utility at the rate specified below. Energy generated during the night time, through battery backup systems, will not be purchased under this schedule.
Residential customers will be charged the current Rate Schedule 1. Commercial customers will be charged under the applicable current Commercial Rate Schedule which they qualify for based on criteria in the electric rate schedules. All of the rate schedules may be changed from time to time.
Energy Rate for Excess Energy Sold to the Utility:
$0.05 per kWh for all kWh’s
Seasonal Service:
This schedule is not available as a seasonal service.
Service Charges:
Refer to the current Logan City Light and Power Fees Schedule for current pricing information pertaining to fees and service charges.
Connection Fee:
Refer to the current Logan City Light and Power Fees Schedule for current pricing information pertaining to fees, service charges and re-read fees. Additional requirements and options for this particular schedule are outlined in the Logan City Light and Power Net Metering Policy.
FORCE MAJEURE:
Neither the City nor Customer shall be subject to any liability or damages due to the inability of the City to serve the Customer’s load due to lack of available power and energy or other conditions beyond the City's control. In the event of natural disasters or acts of God such as earthquakes, floods, or severe storms, neither party shall be liable for damages due to lack of ability for operations which affect the other party economically or in any other way. Should any of the foregoing occur, no minimum billing fees shall be added to the customers’ bill during the time the customer cannot accept service. Any applicable fees shall resume at the time the customer is able to accept service.