None Currently Available
This information is strictly for reference. To be an official planset holder you must sign in at the Logan City Engineering Department at City Hall. Addendums will be posted and sent to those who sign in. All drawings and documents are obtainable from the Logan City Engineering Department located in Logan City Hall
Logan & Blacksmith Fork Rivers Flood Control Project
Other Questions and Comments Posted Here
Main Street Streetscape Phase 3
None Currently Available
Project Name |
Firm |
Dewitt Pipeline ROW Survey |
Skyline AES |
CDBG Sidewalk ROW Survey
|
Foresight |
AARA Sidewalk ROW Survey
|
Skyline AES |
Project Name |
Firm |
DeWitt Hydropower Project |
Whitaker Construction |
DeWitt Power Turbines |
Canyon Hydro |
AARA Sidewalks |
Legrande-Johnson |
CDBG Sidewalks |
EDGE Excavation |