Roads Closed Today

Park Avenue will be closed from 600 South to 1000 South on Wednesday, Nov. 4 and Thursday, Nov. 5. Local traffic only. We are installing a drainage pipe across Park Avenue at 780 South, so residents will have to enter from either the North or South end, depending on which side of 780 South they live on. Call 716-9642 with questions.

 

Please note that not all road closures are performed by the Street department. Other city departments, as well as private contractors, can close a road when necessary. If you have any questions about road closures, call us at 716-9642.

 

Current Projects

Leaf cleanup has begun! Click here for more information.

 

We are replacing/installing sidewalk, curb and gutter, storm drainage, etc., on 600 West from Center Street to 200 South.

 

We are patching roadways throughout the city. If you see a pothole or area that needs to be patched, please report it by calling 716-9642.

 

We are cleaning grates and catch basins throughout the city, as well as repairing and replacing signs as needed.

 

We are sweeping all streets. We try to sweep each street at least twice a year. Higher-traffic streets are swept more often.

 

We are painting crosswalks, turn arrows, street lines, red curb, etc.

 

We are also replacing sidewalk and curb and gutter throughout the city.

 

 


If you have any questions about our current projects, contact us at 716-9642.
 



Completed Projects 2008


Throughout the year we sand and plow streets; install, repair, and clean grates; install and repair signs; sweep the streets; paint street lines, school letters, crosswalks, and turn arrows; remove graffiti; install and maintain sidewalk, curb and gutter, and corners; patch potholes; clean gutters; mowing; concrete hazards; and barricade and sign for events.

We have also Chip & Sealed roads throughout the City.

Other projects completed this year:

Downtown cleaning
CDBG radius corners
River inventory and cleanup
Airport maintenance
Spring cleanup
USU cleanup for graduation

400 West 800 North to 900 North road construction

1235 Cedar Heights storm drain

3285 West 2200 South storm drain

Safety training

Hauling materials from pit

Sign installation and repair

Pipe at Henry's Point

1000 North 300 East canal work and house demo

600 East 200 North sump drain

1300 North 200 West catwalk

Cleaning boxes and culverts

Canal work on Canyon Road

2200 South 3000 West pipe

Chip and Seal

Spring cleanup

1200 East 700 North sidewalk

1900 West 200 North backfilling

617 North 100 East excavation and top soil

Rock haul from 200 East 1700 North

Boulevard

Mowing weeds on shoulder of road

Parkstrip reclamation

Riverwalk pipe

1000 South 800 West top soil and sod

Rose Hill storm drain

Pipe on 1000 West 150 South

Remove tree at 1200 South 100 West

600 West 600 North radius corners and sidewalk

900 East 650 North retaining wall

New Justice Building expansion drainage pipe

Woodruff School entrance

Pioneer Park tree removal

25 West 300 North sidewalk and curb and gutter

100 South 600 West pipe and curb and gutter




 